Is OSH Park a turnkey assembly service?+
The reviewed service catalogue is for bare-board fabrication. Treat parts procurement, component placement and functional testing as separate tasks rather than assuming they are included with the boards.
Why are sets of three relevant?+
Several OSH Park prototype services quote a set of three boards by area. Compare the delivered quantity you actually need and avoid comparing that package price with a per-board assembled-unit quotation.
Can I choose any stack-up with OSH Park?+
Use the published stack-up for the selected service. If you need a different construction, confirm an appropriate service or obtain a custom quote elsewhere before finalizing the layout.
Is bare-board service enough for a first prototype?+
It can be if you are equipped to source and solder the parts and validate the circuit. For fine-pitch packages, unavailable parts or a required test fixture, assembly support may be more practical.
What files should I send to PCBPit?+
Send Gerber and drill files, a BOM with exact manufacturer part numbers, pick-and-place data and assembly drawings. Include quantities, the board revision, test requirements and delivery destination so the quotation covers the build you actually need.
How do I compare the total cost?+
Use the same revision and quantities for each quotation. Include boards, components, setup, assembly, testing, freight and applicable import costs. Separate one-time tooling from recurring costs, and check whether unused parts or fixtures will be returned.
Can I transfer a design from another supplier?+
Yes, you can ask PCBPit to review an existing manufacturing package. Supply the original design outputs rather than a screenshot or an old invoice. Confirm stack-up, finish, panelization and approved component substitutions before ordering the new build.
Does a quotation include functional testing?+
Only when it is part of the agreed scope. Provide firmware, test inputs, expected results and any required fixture. An electrical continuity check or optical inspection does not establish that an assembled product performs its intended function.